OPERATIONS & RELEASE STATUS

See what’s running.

Live infrastructure observations and the steps that still need real production evidence.

Before public funds

Operator setup, backups and canary verification ↗

  1. Review passed — project confirmation. The project owner confirmed on 14 September 2026 that the independent review passed. No public report is available. The reviewer and covered code revision have not been specified, so coverage of the current release, including Pons, is not verified. Review record
  2. Production canary: A real policy deployment, funding, checkpoint and holder claim must be recorded and verified. No completed canary is claimed here.
  3. Operator setup: configure intended policy addresses, archive access, a dedicated gas wallet and monitoring. The status above reports the configured service.
  4. New tokens: Long must issue a valid launch authorization. Verified existing Long and Pons tokens have a separate setup path; Longer cannot issue Long’s signatures.